  • Dublin City Council
  • Inchicore, Dublin
  • Architect: Dublin City Council, Structural Engineer: Michael Punch
  • €14 Million
  • November 2012

New build consisting of Reinforced Insitu Concrete Basement car park, followed by 65 no. Apartments throughout 4 separate blocks some up to 5 floors, single storey Creche, 10 no 2 storey houses and associated site works and landscaping.

Block F & G

  • Site setup, Excavate & Pour Basement Slab Followed by in situ concrete Transfer slab,
  • Structural Block work walls and precast concrete slabs installed and repeated on each level up to the asphalt coated roof.
  • Envelope works to include brickwork, Aluclad windows, and Zinc cladding.
  • M&E and internal finishes fit out to follow.

Block D, E & Creche

  • Install CFA, excavate & blind ground Beams
  • Install Drainage, followed by Precast concrete slab followed by Structural Block work walls and precast concrete slab installation repeated on each level up to the Asphalt coated roof.
  • Envelope works to include brickwork, Aluclad windows, and Zinc cladding.
  • M&E and internal finishes fit out to follow.
  • Creche Roof consists of a Green Sedum system.

Houses

  • Backfill Basement retaining walls
  • Excavate and install Strip foundations and drainage.
  • Build Blockwork walls and Brickwork facades followed by a naturally slated roof.
  • Internal finishes and M&E fit out to follow.